![]() |
The president of the moon needs to make a public announcement! Yellow activates the Beta Command Base radio station mixer to broadcast the message. ![]() |
![]() |
Red Team is called in to route the audio signal to the proper channels. ![]() |
![]() |
White adjusts the transmission antenna to compensate for the solar flares. ![]() |
![]() |
Blue Team makes sure that the volume levels are correct. "Why do we always get stuck doing the manual labor?" ![]() |
![]() |
White team confirms that all channels are running in the green! ![]() |
![]() |
Once the Tesla coil is activated, the announcement is broadcast throughout the solar system. Another successful mission for the classic Lego team! ![]() |